A military hospital in Fort Belvoir, Va., will use a heat recovery chiller system along the way to 27 percent in energy savings. The hospital, scheduled to open in early 2011, also will be the first U.S. hospital built to LEED Silver status, reports ContractorMag. Hospitals are noted for their energy consumption. This one will […]
↧